Over a home-by-assets basis, this get the job done will Stick to the EPA’s Original hazardous elements removal in Phase 1. However, the military Corps of Engineers will not wait around right up until all the EPA get the job done is done all through the melt away locations in advance of stepping in to start their Stage two do the job. Phase 1 and